Company H · Precision machining

Real-time work progress management with shop-floor kiosks

Shop-floor kiosks enabled direct result entry and next-task checks while managers monitored progress in real time.

Entering work status on a rugged kiosk beside an assembly station — AI-generated illustration
IndustryPrecision machining
Connected dataWork orders, shop-floor results, next tasks, process progress, and delivery status
Measured result70% faster shop-floor to office communication and 98% on-time delivery

Implementation

Operator kiosk screens that reduced movement and duplicate entry were connected to a real-time management dashboard.

Outcome

With operators checking results and next tasks directly on the kiosk and managers watching the same data on a live dashboard, the time spent going back and forth between the floor and the office fell 70% and on-time delivery reached 98%.

70% faster shop-floor to office communication and 98% on-time delivery

Validation method

Communication time and on-time delivery records were compared for measured periods before and after implementation.

Terms used in this case study

Definitions follow the IYULAB manufacturing glossary.

  • Work Order A work order is the execution unit that tells the floor what to make, how many, and under what conditions. It is the anchor that production results and quality history attach to.
  • MES A Manufacturing Execution System (MES) records and manages how a work order is actually carried out on the shop floor, in real time. It closes the gap between what was planned and what happened.
  • OEE Overall Equipment Effectiveness (OEE) expresses how much of its planned time a machine actually delivered, as a single ratio combining availability, performance and quality.

Related implementation guides

Step-by-step articles on the same topics.

  • Shop-floor entrypeople actually use Systems that go live and then go unused are common. The cause is design, not willingness. When entry increases and nothing comes back, no system holds.
  • Phased rollout:choosing phase one Advice to go in phases is common; what phase one should be is not. Three criteria apply: the effect must be visible, the data must be easy to obtain, and failure must not stop production.

Quick Answers

Key answers about this implementation

The connected data, operational change, and validation basis at a glance.

What data was connected?

Work orders, shop-floor results, next tasks, process progress, and delivery status

What changed operationally?

Operator kiosk screens that reduced movement and duplicate entry were connected to a real-time management dashboard.

How was the result validated?

Communication time and on-time delivery records were compared for measured periods before and after implementation.

Sources and standards

Terms and procedures on this page follow the public standards and official sources below. Figures are as of each source's publication date.

Key facts
TopicReal-time work progress management with shop-floor kiosks | IYULAB
SectionCase Studies
Standards appliedISO 9241-110:2020, Interaction principles · ISO 9241-11:2018, Usability: Definitions and concepts · ISA-95 (IEC 62264), Enterprise-Control System Integration
Public recordGS certification grade 1 of 2 grades · 7 patents registered
Reviewed byIYULAB engineering team
Last updated

Public record: GS certification, grade 1 of 2 grades (U-CMMS 3.0, Telecommunications Technology Association) · 7 patents registered (10-2141840, 10-2141847, 10-2147747, 10-2354546, 10-2408497, 10-2408501, 10-2698341; searchable by number on KIPRIS) · Certifications and patentsReviewed by the IYULAB engineering team · Last updated: