Display Equipment

Display equipment
smart factory

When coating conditions and inspection results live in separate systems, a defect cannot be traced to the conditions that produced it. Putting both on the same time axis is the starting point.

Implementation sequence

  1. Process conditions and inspection results live apart

    The coater keeps its data, the AOI keeps its own.

  2. Equipment data stays inside the equipment

    The values exist in the PLC but never leave it.

  3. Checking equipment state means walking to the office

    There is no way to see current equipment state or the next job from the floor, so people go back and forth.

Where display equipment plants get stuck

Problems that come up repeatedly in implementation discussions.

Field issue

Process conditions and inspection results live apart

The coater keeps its data, the AOI keeps its own. When thickness deviation appears, matching it to the equipment conditions at that moment is manual work.

Field issue

Equipment data stays inside the equipment

The values exist in the PLC but never leave it. You can read them on the machine screen, but they never accumulate into a history you can trend.

Field issue

Checking equipment state means walking to the office

There is no way to see current equipment state or the next job from the floor, so people go back and forth.

Field issue

Recipe changes leave no trace

Who changed which setting and when is not recorded, so explaining why yesterday and today differ is guesswork.

What gets connected

Machine signals and floor entry combined into history.

What is connectedHow it is collectedWhat it produces
Coating equipment PLCEthernet PLC protocol or gatewayTemperature, speed, thickness condition history
AOI / vision verdictInspection machine integrationDefect type and location
Recipe and setting changesEquipment log or entryChange time and who made it
Alarms and stopsPLC contact or logDowntime classification
Work orderIssued from MESTies lot to conditions and inspection results

Build sequence

Nothing is converted all at once. High-impact areas are built and verified first.

  1. STEP 01

    Choose what to collect

    Not everything in the PLC — start with the values you can connect to quality. More tags is not better; interpretable is better.

  2. STEP 02

    Merge equipment and inspection data

    Put conditions and verdicts on the same time axis and group by lot. This is the point at which condition and outcome become readable together.

  3. STEP 03

    Put a kiosk on the floor

    Show state, current instruction and recent verdicts next to the machine.

  4. STEP 04

    Watch trend and deviation

    Catch the moment conditions leave the control range and read it alongside the inspection result.

Applied solutions

Scope is composed after reviewing equipment and workflow.

Related case studies

Each case states its disclosure scope and the basis for its figures.

Quick Answers

Display equipment — frequently asked

Questions that come up on display equipment floors.

Does reading the PLC affect the equipment?

Access is read-only and does not participate in control. What is checked in advance is the manufacturer's warranty terms and communication load, which set the polling interval.

Which values should we collect first?

The ones you can use to explain a defect. Temperature and speed, where a condition change shows up directly in the result, come first; the list can grow later.

Will AOI machines from different vendors integrate?

If a verdict can be exported by file or protocol, it is a candidate. Differing output formats are standardised in the collection layer.

Can the collected data support AI analysis?

Once enough has accumulated, yes. Analysis has to be preceded by cleaning missing and outlier values, and that cleaning largely determines the quality of the result.

What should the floor kiosk display?

Only what the operator has to decide on now — equipment state, current instruction, recent verdicts. Too many items and it stops being read.

Display equipment: start with a survey

Communication methods and data condition are established first, then scope is agreed.

Request a site survey
KR KO