
Implementation
A traceability structure linked each welding point and operator result to drawings and manufacturing history.
Outcome
With each welding point's operator and result automatically linked to drawings and manufacturing history, the manual work of assembling audit records dropped sharply, cutting response time by 90% while every required traceability field stayed fully recorded.
Validation method
Audit preparation time and completion of required traceability fields were reviewed for the measured manufacturing records.